TUTORIALS
UPDATES
-
Added the option to perform a flow test with a portable flowmeter as well as change the language to better suite the report.
-
Recommended starting and stop pressures for both FP and JP
-
Use of decimal points in Shut off, 100%, and 150% set up for more accurate charts
-
Added in Diesel and Electric Fire Pump flow tests an option to indicate the differential percentage between the field points and the factory points
-
Added "Additional Comments" option for both electric and diesel fire pump flow tests/start-ups
-
Hydrant tests are now available in the START-UPS & FLOW TESTS tab for both FPR and sprinkler contractors!
-
Changed tabs from FPR and SPRINKLER CONTRACTOR to START-UPS & FLOW TESTS and INSPECTIONS.
-
Fixed an issue on Chrome and Edge that did not allow users to do new projects.
-
There are now 10 test header valves for flow tests. This allows the person conducting the flow tests to be able to perform higher capacity pumps.