top of page

TUTORIALS

UPDATES

  • Added the option to perform a flow test with a portable flowmeter as well as change the language to better suite the report.

  • Recommended starting and stop pressures for both FP and JP

  • Use of decimal points in Shut off, 100%, and 150% set up for more accurate charts

  • Added in Diesel and Electric Fire Pump flow tests an option to indicate the differential percentage between the field points and the factory points 

  • Added "Additional Comments" option for both electric and diesel fire pump flow tests/start-ups

  • Hydrant tests are now available in the START-UPS & FLOW TESTS tab for both FPR and sprinkler contractors!

  • Changed tabs from FPR and SPRINKLER CONTRACTOR to START-UPS & FLOW TESTS and INSPECTIONS.

  • Fixed an issue on Chrome and Edge that did not allow users to do new projects. 

  • There are now 10 test header valves for flow tests. This allows the person conducting the flow tests to be able to perform higher capacity pumps. 

bottom of page